Stronger Together|Built for America's Future

    National Project Database

    PROJECTS SHAPING AMERICA'S
    DIGITAL FUTURE

    Track proposed, approved, under construction, and operational digital infrastructure projects across the United States. Each project includes verified sources, community context, and development status.

    Digital Infrastructure Across America

    Use the interactive map to explore projects by state and status. Click any state or project card for detailed information.

    Interactive Geographic Database

    DIGITAL INFRASTRUCTURE ACROSS AMERICA

    51 projects tracked across 41 states. Click any dot to inspect verified data center developments, power loads, utilities, and community issues. Red dots indicate projects facing opposition or moratoriums.
    [ Interactive US Map — Click Dot to Inspect ]
    Operating Construction Approved Entitlement Proposed Delayed / Opposition
    QUICK FILTER BY STATE MARKET:
    Virginia Market Index • Loudoun County

    Northern Virginia Digital Hub (Data Center Alley)

    OPERATING
    Developer:Vantage Data Centers
    Exact Location:Ashburn, Loudoun County, VA
    Utility Provider:Dominion Energy
    Tenant/End User:AWS / Microsoft Azure Cloud
    Est. Power Demand450 MW
    Est. Capital Investment$3.5 Billion
    Site Footprint180 Acres
    Estimated Jobs2,500 Construction / 220 Permanent
    Community & Policy Considerations

    Substation visual buffers, noise abatement ordinances, high-voltage line undergrounding

    Latest Status & Public Filing Update:

    August 2026: Expansion phase 3 completed with noise attenuation barriers.

    Verified Citations: 12 Public FilingsSourced Record
    All Filtered Results (51):

    All Projects

    Showing 51 of 51 projects

    Northern Virginia Digital Hub (Data Center Alley)

    Operating
    Ashburn, Loudoun County, VA
    Developer: Vantage Data Centers
    Capacity450 MW
    Investment$3.5 Billion
    UtilityDominion Energy
    Est. Jobs2,500 Construction

    Substation visual buffers, noise abatement ordinances, high-voltage line undergrounding

    August 2026: Expansion phase 3 completed with noise attenuation barriers.View Details

    Loudoun County Data Center Overlay District Expansion

    Under Construction
    Ashburn & Leesburg, Loudoun County, VA
    Developer: Multiple Developers (Compass, QTS, CyrusOne)
    Capacity5,000+ MW (Cumulative)
    Investment$25+ Billion (Cumulative)
    UtilityDominion Energy
    Est. Jobs15,000+ Construction

    Transmission corridor saturation, rural character erosion, school capacity strain, JLARC review of tax incentives

    August 2026: Virginia JLARC report finds data centers support 74,000 jobs and $9.1B annual GDP contribution; Dominion announces new 500kV transmission lines.View Details

    Fredericksburg Technology Corridor

    Delayed (Opposition/Moratorium)
    Spotsylvania County, VA
    Developer: QTS Data Centers
    Capacity400 MW
    Investment$2.5 Billion
    UtilityDominion Energy / Rappahannock Electric Cooperative
    Est. Jobs1,800 Construction

    Organized community opposition group "Protect Spotsylvania" filed legal challenge; concerns over water withdrawal from Ni River, noise impacts, and rural character; special use permit delayed by Board of Supervisors.

    August 2026: Board of Supervisors voted to delay special use permit decision pending additional environmental review; community opposition group has filed appeal.View Details

    Prince William Digital Gateway

    Under Construction
    Gainesville, Prince William County, VA
    Developer: Compass Datacenters / QTS
    Capacity1,200 MW
    Investment$10.0 Billion+
    UtilityDominion Energy / NOVEC
    Est. Jobs5,000+ Construction

    Proximity to Manassas National Battlefield Park, stormwater runoff, rural land preservation

    July 2026: Comprehensive rezoning affirmed; site engineering studies under review.View Details

    Henrico Technology Park

    Operating
    Henrico County, VA
    Developer: Meta / QTS
    Capacity300 MW
    Investment$1.8 Billion
    UtilityDominion Energy
    Est. Jobs1,200 Construction

    Water usage for evaporative cooling towers, local tax allocation

    June 2026: Closed-loop recycled water agreement finalized with Henrico County Public Utilities.View Details

    Lone Star AI & Compute Gateway

    Under Construction
    Red Oak, Ellis County, TX
    Developer: QTS Data Centers
    Capacity600 MW
    Investment$3.8 Billion
    UtilityOncor Electric Delivery / ERCOT
    Est. Jobs2,800 Construction

    Peak summer power draw impact on ERCOT grid reliability, transmission line routing

    August 2026: Substation construction 60% complete; generation interconnection approved.View Details

    San Antonio Technology Campus

    Operating
    West Bexar County, TX
    Developer: Microsoft / CyrusOne
    Capacity350 MW
    Investment$2.2 Billion
    UtilityCPS Energy
    Est. Jobs1,500 Construction

    Edwards Aquifer protection zone compliance, dry-cooling mandatory transition

    May 2026: Transitioned to 100% dry air-cooling technology.View Details

    Buckeye Innovation Campus

    Under Construction
    New Albany, Licking County, OH
    Developer: Amazon Web Services (AWS)
    Capacity500 MW
    Investment$3.5 Billion
    UtilityAEP Ohio
    Est. Jobs2,200 Construction

    Electrical transmission buildout, local school district tax agreement structure

    July 2026: $4.5M annual PILOT educational grant agreement signed.View Details

    Central Ohio Digital Hub

    Proposed
    Lancaster, Fairfield County, OH
    Developer: DataBank
    Capacity220 MW
    Investment$1.4 Billion
    UtilityAEP Ohio
    Est. Jobs900 Construction

    Agricultural land rezoning, noise performance criteria

    August 2026: Planning commission public hearing scheduled.View Details

    Great Lakes Technology Campus

    Proposed
    Benton Harbor, Berrien County, MI
    Developer: CyrusOne
    Capacity450 MW
    Investment$2.4 Billion
    UtilityIndiana Michigan Power (AEP)
    Est. Jobs1,800 Construction

    Water resource stewardship, high-voltage transmission corridor routing

    August 2026: Public hearing on municipal water reuse agreement held.View Details

    Bluegrass Digital Infrastructure Park

    Entitlement
    Shelbyville, Shelby County, KY
    Developer: Compass Datacenters
    Capacity250 MW
    Investment$1.2 Billion
    UtilityKentucky Utilities (KU) / LG&E
    Est. Jobs950 Construction

    Agricultural preservation, industrial power tariff cost allocation

    June 2026: Special rate tariff structure submitted to Kentucky Public Service Commission.View Details

    Paducah American Energy Hub

    Proposed
    Paducah, McCracken County, KY
    Developer: Multiple (Public-Private Partnership w/ DOE)
    Capacity10,000+ MW (Multi-Phase)
    Investment$100 Billion+
    UtilityTVA / On-site Generation (Nuclear + Solar)
    Est. Jobs20,000+ Construction

    Redevelopment of former Paducah Gaseous Diffusion Plant site; environmental remediation oversight; Ohio River water withdrawal permits; TVA interconnection review; community information sessions ongoing

    August 2026: DOE announces selection of development partner for former uranium enrichment site; $100B+ multi-phase AI data center campus; community information session held at Paducah Tilghman High School; environmental remediation plan under public review.View Details

    Franklin-Simpson Technology Center

    Entitlement
    Franklin, Simpson County, KY
    Developer: TBC
    Capacity300 MW
    Investment$1.5 Billion
    UtilityFranklin Electric Plant Board / TVA
    Est. Jobs1,200 Construction

    Rural farmland conversion, I-65 corridor transmission capacity, local school funding negotiations

    July 2026: Simpson County Fiscal Court held first reading of rezoning ordinance; public comment period open.View Details

    Cave City Digital Campus

    Delayed (Opposition/Moratorium)
    Cave City, Barren County, KY
    Developer: TBC
    Capacity180 MW
    Investment$900 Million
    UtilityFarmers Rural Electric Cooperative / TVA
    Est. Jobs700 Construction

    Organized community opposition due to proximity to Mammoth Cave National Park; karst groundwater sensitivity concerns; local moratorium discussion; lawsuit filed by community group challenging rezoning; National Park Service submitted formal public comment opposing development.

    August 2026: Barren County Fiscal Court enacted temporary moratorium on data center rezoning; community group filed lawsuit challenging prior rezoning approval; environmental assessment of karst geology commissioned.View Details

    Louisville PowerHouse AI Campus

    Proposed
    Louisville, Jefferson County, KY
    Developer: PowerHouse / Local JV
    Capacity500 MW
    Investment$3.5 Billion
    UtilityLG&E and KU Energy
    Est. Jobs2,800 Construction

    Urban-edge location near residential areas; noise and visual impact concerns; Ohio River water withdrawal; LG&E rate case impact on existing ratepayers; community engagement meetings ongoing

    August 2026: LG&E filed special rate tariff with Kentucky PSC for large-load customer; community open house attended by 400+ residents; Louisville Metro Council reviewing zoning ordinance amendment for data center overlay district.View Details

    Sonoran Desert Digital Hub

    Operating
    Mesa, Maricopa County, AZ
    Developer: Stack Infrastructure / Meta
    Capacity400 MW
    Investment$2.8 Billion
    UtilitySRP (Salt River Project)
    Est. Jobs1,600 Construction

    Extreme water conservation requirements, solar & battery storage integration

    July 2026: 100% zero-water air-cooled facility expansion operational.View Details

    Peach State Tech Center

    Under Construction
    Fayetteville, Fayette County, GA
    Developer: Vantage / QTS Data Centers
    Capacity380 MW
    Investment$2.9 Billion
    UtilityGeorgia Power
    Est. Jobs2,000 Construction

    Georgia Power rate plan review, green space buffer zones

    August 2026: On-site substation energization complete.View Details

    Midwest Metro Compute Campus

    Operating
    Elk Grove Village, Cook County, IL
    Developer: Digital Realty
    Capacity320 MW
    Investment$2.1 Billion
    UtilityComEd (Exelon)
    Est. Jobs1,300 Construction

    Urban footprint optimization, grid redundancy

    April 2026: Phase 2 commissioning completed.View Details

    Keystone Clean Power Compute Hub

    Approved
    Luzerne County, PA
    Developer: Talen Energy
    Capacity300 MW
    Investment$1.6 Billion
    UtilityPPL Electric / PJM Interconnection
    Est. Jobs1,100 Construction

    Direct nuclear co-location power agreements, PJM grid tariff allocation

    July 2026: FERC co-location tariff framework submitted for regulatory review.View Details

    Badger State Technology Hub

    Under Construction
    Mount Pleasant, Racine County, WI
    Developer: Microsoft
    Capacity400 MW
    Investment$3.3 Billion
    UtilityWe Energies
    Est. Jobs2,300 Construction

    Workforce local hiring commitments, Lake Michigan water protective limits

    August 2026: Main building structural steel erection underway.View Details

    Piedmont Compute Center

    Operating
    Maiden, Catawba County, NC
    Developer: Apple / Meta
    Capacity300 MW
    Investment$2.0 Billion
    UtilityDuke Energy Carolinas
    Est. Jobs1,200 Construction

    Duke Energy clean energy transition alignment, local tax revenue distribution

    June 2026: On-site solar + battery storage expansion commissioned.View Details

    Heartland Data Center Campus

    Operating
    Council Bluffs, Pottawattamie County, IA
    Developer: Google
    Capacity700 MW
    Investment$5.0 Billion+
    UtilityMidAmerican Energy
    Est. Jobs2,000 Construction

    Wind energy procurement, rural community infrastructure strain

    May 2026: Fourth building expansion announced; 100% renewable wind energy match.View Details

    Columbia Gorge Compute Campus

    Operating
    The Dalles, Wasco County, OR
    Developer: Google
    Capacity400 MW
    Investment$2.4 Billion
    UtilityNorthern Wasco County PUD
    Est. Jobs1,400 Construction

    Columbia River water rights, hydroelectric allocation, rural community character

    June 2026: Third data center building commissioned; water usage reporting agreement with city updated.View Details

    Tahoe-Reno Industrial Tech Park

    Operating
    Reno, Storey County, NV
    Developer: Switch / Apple
    Capacity550 MW
    Investment$3.0 Billion
    UtilityNV Energy
    Est. Jobs1,800 Construction

    Desert water conservation, transmission line expansion through federal land

    July 2026: Mega campus expansion completed; NV Energy transmission upgrade online.View Details

    Wasatch Mountain Digital Campus

    Under Construction
    Eagle Mountain, Utah County, UT
    Developer: Meta
    Capacity350 MW
    Investment$1.8 Billion
    UtilityRocky Mountain Power
    Est. Jobs1,500 Construction

    Rapid residential growth strain, school district capacity, water aquifer sustainability

    August 2026: Phase 2 foundation work underway; city water agreement approved.View Details

    Crossroads Compute Campus

    Proposed
    Fort Wayne, Allen County, IN
    Developer: TBC
    Capacity250 MW
    Investment$1.3 Billion
    UtilityIndiana Michigan Power (AEP)
    Est. Jobs1,000 Construction

    Agricultural land conversion, transmission corridor routing, local hiring commitments

    August 2026: AEP interconnection feasibility study initiated; community town hall scheduled.View Details

    Magnolia State Digital Hub

    Proposed
    Madison County, MS
    Developer: TBC
    Capacity220 MW
    Investment$1.1 Billion
    UtilityEntergy Mississippi
    Est. Jobs850 Construction

    Rural infrastructure capacity, Entergy generation planning, community engagement timing

    July 2026: Entergy Mississippi generation adequacy review in progress.View Details

    Palmetto Compute Corridor

    Under Construction
    Berkeley County, SC
    Developer: Google
    Capacity400 MW
    Investment$2.6 Billion
    UtilityDominion Energy / Santee Cooper
    Est. Jobs1,700 Construction

    Lake Marion water withdrawal review, transmission line routing through wetlands

    August 2026: Site grading 70% complete; first building slab poured.View Details

    Rocket City Data Campus

    Operating
    Huntsville, Limestone County, AL
    Developer: Meta
    Capacity300 MW
    Investment$1.5 Billion
    UtilityTennessee Valley Authority
    Est. Jobs1,200 Construction

    TVA generation mix, agricultural land conversion, Tennessee River water allocation

    June 2026: Phase 2 fully operational; TVA renewable energy matching agreement signed.View Details

    Volunteer State Compute Hub

    Under Construction
    Clarksville, Montgomery County, TN
    Developer: Oracle
    Capacity350 MW
    Investment$2.0 Billion
    UtilityCumberland Electric / TVA
    Est. Jobs1,600 Construction

    Cumberland River watershed protection, local school capacity, Ft. Campbell proximity

    August 2026: Building 1 steel framing complete; utility substation energized.View Details

    North Star Technology Campus

    Proposed
    Becker, Sherburne County, MN
    Developer: TBC
    Capacity200 MW
    Investment$1.2 Billion
    UtilityXcel Energy
    Est. Jobs800 Construction

    Coal plant site redevelopment, Mississippi River watershed, Xcel rate case impact

    July 2026: Xcel Energy integrated resource plan review; community meeting held at Becker High School.View Details

    Garden State Digital Infrastructure Hub

    Operating
    Piscataway, Middlesex County, NJ
    Developer: Equinix / Digital Realty
    Capacity280 MW
    Investment$1.7 Billion
    UtilityPSE&G
    Est. Jobs1,100 Construction

    Dense urban grid capacity, PJM interconnection queue delays

    May 2026: Expansion building commissioned; PSE&G substation upgrade complete.View Details

    Hudson Valley Digital Infrastructure Project

    Delayed (Opposition/Moratorium)
    Newburgh, Orange County, NY
    Developer: TBC
    Capacity300 MW
    Investment$1.8 Billion
    UtilityCentral Hudson Gas & Electric
    Est. Jobs1,400 Construction

    New York statewide data center moratorium enacted; organized community opposition over Hudson River watershed; ratepayer cost allocation concerns; state legislation requiring comprehensive environmental review before approval

    August 2026: New York State Legislature passed temporary moratorium on new data center permits pending statewide impact study; project applications frozen; developer exploring compliance pathway.View Details

    Silicon Valley Compute Expansion

    Operating
    Santa Clara, Santa Clara County, CA
    Developer: Equinix / Digital Realty
    Capacity400 MW
    Investment$3.2 Billion
    UtilitySilicon Valley Power / PG&E
    Est. Jobs2,000 Construction

    California energy grid strain, Title 24 energy compliance, water recycling mandates, urban heat island concerns

    July 2026: Silicon Valley Power announces dedicated data center rate structure with renewable energy matching; facility achieves Title 24 compliance with closed-loop cooling.View Details

    Columbia Basin Data Center Campus

    Under Construction
    Quincy, Grant County, WA
    Developer: Microsoft
    Capacity500 MW
    Investment$2.0 Billion
    UtilityGrant County PUD
    Est. Jobs1,800 Construction

    Columbia River hydroelectric allocation, Grant County PUD rate structure review, agricultural land conversion, community growth management

    August 2026: Phase 4 expansion underway; Grant County PUD approves new industrial rate class for hyperscale loads with cost allocation safeguards.View Details

    Monocacy Technology Campus

    Proposed
    Frederick, Frederick County, MD
    Developer: TBC
    Capacity250 MW
    Investment$1.5 Billion
    UtilityPotomac Edison / PJM
    Est. Jobs1,100 Construction

    Organized community opposition over rural character and agricultural land; Monocacy River watershed protection; transmission line routing through residential areas; county council considering data center zoning ordinance

    August 2026: Frederick County Council held public hearing attended by 500+ residents; opposition group "Save Frederick" formed; zoning amendment for data center overlay district under review.View Details

    Rocky Mountain Compute Campus

    Entitlement
    Aurora, Arapahoe County, CO
    Developer: TBC
    Capacity280 MW
    Investment$1.6 Billion
    UtilityXcel Energy Colorado
    Est. Jobs1,200 Construction

    Xcel Energy rate case impact, South Platte River water rights, prairie land conversion, community opposition over noise and visual impacts

    July 2026: Xcel Energy filed large-load tariff with Colorado PUC; Aurora Planning Commission reviewing site plan; community meeting scheduled.View Details

    Sunshine State Digital Infrastructure Hub

    Approved
    Jacksonville, Duval County, FL
    Developer: TBC
    Capacity350 MW
    Investment$2.2 Billion
    UtilityJEA / Florida Power & Light
    Est. Jobs1,600 Construction

    St. Johns River water management, wetland mitigation, hurricane resilience standards, local hiring commitments

    August 2026: Site plan approved by Jacksonville City Council; JEA confirms transmission capacity; construction start targeted for Q4 2026.View Details

    Sooner State Compute Campus

    Proposed
    Tulsa, Tulsa County, OK
    Developer: TBC
    Capacity250 MW
    Investment$1.3 Billion
    UtilityPublic Service Company of Oklahoma (AEP)
    Est. Jobs1,000 Construction

    Arkansas River water allocation, tornado resilience standards, PSO transmission buildout, community engagement timing

    August 2026: PSO interconnection feasibility study initiated; Tulsa County Commission reviewing rezoning application.View Details

    Ozark Digital Infrastructure Campus

    Proposed
    Bentonville, Benton County, AR
    Developer: TBC
    Capacity200 MW
    Investment$1.1 Billion
    UtilityCarroll Electric Cooperative
    Est. Jobs850 Construction

    Ozark forest land conversion, Beaver Lake watershed protection, rural transmission capacity, community growth management

    July 2026: Carroll Electric initiated transmission planning study; community town hall attended by 300+ residents.View Details

    Gem State Technology Campus

    Entitlement
    Boise, Ada County, ID
    Developer: TBC
    Capacity250 MW
    Investment$1.4 Billion
    UtilityIdaho Power
    Est. Jobs1,000 Construction

    Boise River water rights, Idaho Power rate case, agricultural land conversion, organized community opposition over rapid growth

    August 2026: Idaho Power filed large-load service tariff with PUC; Ada County Commission reviewing conditional use permit; community group "Keep Boise Rural" formed.View Details

    Cowboy State Compute Campus

    Under Construction
    Cheyenne, Laramie County, WY
    Developer: Microsoft
    Capacity300 MW
    Investment$1.5 Billion
    UtilityBlack Hills Energy / PacifiCorp
    Est. Jobs1,200 Construction

    Wind energy procurement, high-altitude cooling efficiency, rural infrastructure capacity, water source from Cheyenne aquifer

    August 2026: Foundation work 40% complete; 100% wind energy power purchase agreement signed with PacifiCorp.View Details

    Land of Enchantment Compute Hub

    Operating
    Los Lunas, Valencia County, NM
    Developer: Meta
    Capacity350 MW
    Investment$2.0 Billion
    UtilityPNM (Public Service Company of NM)
    Est. Jobs1,400 Construction

    Rio Grande water allocation, desert water conservation, solar energy matching, community growth management

    June 2026: Phase 2 fully operational; 100% solar energy matching through PNM renewable program; zero-water air-cooling deployed.View Details

    Gateway Arch Digital Campus

    Proposed
    Wentzville, St. Charles County, MO
    Developer: TBC
    Capacity220 MW
    Investment$1.2 Billion
    UtilityAmeren Missouri
    Est. Jobs900 Construction

    Missouri River water withdrawal, Ameren rate case impact, agricultural land conversion, community engagement timing

    August 2026: Ameren Missouri interconnection study initiated; St. Charles County Planning Commission reviewing rezoning application.View Details

    Flickertail State Data Campus

    Proposed
    Bismarck, Burleigh County, ND
    Developer: TBC
    Capacity180 MW
    Investment$900 Million
    UtilityMontana-Dakota Utilities
    Est. Jobs700 Construction

    Missouri River water allocation, coal-to-data transition, rural infrastructure capacity, cold-climate cooling efficiency advantage

    July 2026: Montana-Dakota Utilities filed large-load tariff; Burleigh County Commission reviewing site plan; developer highlighting cold-climate free cooling advantage.View Details

    Mount Rushmore State Compute Campus

    Proposed
    Sioux Falls, Minnehaha County, SD
    Developer: TBC
    Capacity150 MW
    Investment$800 Million
    UtilityXcel Energy
    Est. Jobs600 Construction

    Big Sioux River watershed, agricultural land conversion, Xcel Energy transmission capacity, community growth management

    August 2026: Xcel Energy interconnection feasibility study initiated; Minnehaha County Commission reviewing rezoning application.View Details

    Pelican State Digital Hub

    Proposed
    Baton Rouge, East Baton Rouge Parish, LA
    Developer: TBC
    Capacity230 MW
    Investment$1.3 Billion
    UtilityEntergy Louisiana
    Est. Jobs1,000 Construction

    Mississippi River water withdrawal, hurricane resilience standards, Entergy generation capacity, wetland mitigation, community engagement timing

    July 2026: Entergy Louisiana generation adequacy review; East Baton Rouge Parish Council reviewing zoning amendment.View Details

    Sunflower State Technology Campus

    Entitlement
    Kansas City, Wyandotte County, KS
    Developer: TBC
    Capacity200 MW
    Investment$1.0 Billion
    UtilityEvergy
    Est. Jobs800 Construction

    Kansas River water allocation, Evergy rate case impact, industrial zoning expansion, community growth management

    August 2026: Evergy filed large-load tariff with Kansas Corporation Commission; Wyandotte County Commission reviewing conditional use permit.View Details

    Constitution State Compute Hub

    Proposed
    New Britain, Hartford County, CT
    Developer: TBC
    Capacity120 MW
    Investment$700 Million
    UtilityEversource / United Illuminating
    Est. Jobs500 Construction

    Connecticut River watershed, dense urban grid capacity, Eversource rate impact, brownfield site redevelopment advantage

    July 2026: Eversource interconnection study initiated; New Britain Planning Commission reviewing brownfield redevelopment plan.View Details

    First State Digital Infrastructure Campus

    Proposed
    New Castle, New Castle County, DE
    Developer: TBC
    Capacity100 MW
    Investment$600 Million
    UtilityDelmarva Power
    Est. Jobs400 Construction

    Delaware River watershed, PJM interconnection queue, industrial zoning, community growth management

    August 2026: Delmarva Power interconnection feasibility study; New Castle County Council reviewing rezoning application.View Details

    Bay State Technology Campus

    Proposed
    Westborough, Worcester County, MA
    Developer: TBC
    Capacity150 MW
    Investment$800 Million
    UtilityEversource / National Grid
    Est. Jobs600 Construction

    Massachusetts energy grid strain, urban-edge noise concerns, community opposition over traffic and visual impacts, Assabet River watershed protection

    July 2026: Eversource interconnection study initiated; Westborough Planning Board reviewing site plan; community meeting attended by 200+ residents.View Details

    About This Database

    The American Digital Infrastructure Coalition maintains this database as a public resource. Project information is compiled from public filings, utility documents, news reports, government records, and developer announcements. Each entry includes source citations where available. Data is updated as new information becomes available. We do not display synthetic statistics or fabricated data. If you have corrections or additions, please contact us.